Recent Work on Losses
•Muon1 modified to count lost particle energies
•For a 4MW p+ beam:
–35kW deposited in S1 (r=10cm)
–Large >1kW amounts deposited up to S5
•Added “collimators” to the simulation
–Decreases losses to 10’s of watts in all but S1 and S2
–S1 needs enlarging to accommodate an entire Larmor rotation
•Consistent target-area layout is needed