| Title | Date | Notes |
|---|
Poster Presented at IPAC'10 (.pdf, 774 KB) / View as image | May 2010 | |
Optimising Pion Production Target Shapes for the Neutrino Factory (.pdf, 257 KB) | May 2010 | |
Talk on Alternative Upgrade Options involving VOX-FFAGs at the ISIS MW Upgrades Meeting (.pdf, 273 KB) | May 2009 | |
Poster Presented at PAC'09 (.pdf, 635 KB) / View as image | May 2009 | |
Paper presented at PAC'09: "Extending the Energy Range of 50Hz Proton FFAGs" (.pdf, 153 KB) | May 2009 | |
Poster presented at the John Adams Institute Review on the Neutrino Factory (.ppt, 1.02 MB) | February 2009 | |
Talk on the Neutrino Factory given at RAL/DL Joint Accelerator Workshop (.pdf, 1.44 MB) | January 2009 | |
Pion production data presented at the 2nd Oxford–Princeton High-Power Target Workshop (.zip, 396 KB) | November 2008 | Presented as three Excel files |
Simulations of pion production from water-cooled solid targets using MARS15 (.pdf, 277 KB) | September 2008 | NuFact'08 Conference Paper |
Talk Given at UKNF Meeting on Combining HARP Experimental Data with Muon Transmission Estimates for the ISS Baseline (.ppt, 388 KB) | September 2008 | |
Talk Given at UKNF Meeting on Water-Cooled Targets (.ppt, 579 KB) | April 2008 | Also presented at NuFact'08 |
Comparison of HARP tantalum 5% interaction length data against simulations using MARS 15.07 | August 2007 | |
UKNF Conceptual Design Poster presented at the ASTeC Advisory Board Poster Session (.ppt, 6.03 MB) | February 2007 | "Links" were to other posters presented in the same session |
Talk Given at Frascati BENE meeting: Lower-Frequency RF Phase Rotation (.ppt, 318 KB) | November 2006 | Includes Matthew McCullough's summer work |
Talk Given at NuFact'06: Lower-Frequency RF Phase Rotation Techniques for Both Muon Signs (.ppt, 467 KB) | August 2006 | You can also download the files for animation (under Windows) from the 'player' subdirectory |
Poster Presented at EPAC'06 (.ppt, 574 KB) / View as image | June 2006 | |
Paper presented at EPAC'06: "Secondary Particle Production and Capture for Muon Accelerator Applications" (.pdf, 383 KB) | June 2006 | |
Target Yield Considerations Talk Given at RAL Scoping Study Meeting (.ppt, 4.24 MB) | April 2006 | |
Talk Given at the John Adams Institute Advisory Board Meeting (.ppt, 766 KB) | February 2006 | A short summary talk, only 10-15 minutes long |
Monte Carlo Modelling of Many-Body Decays (.pdf, 145 KB) | January 2006 | Note describing the multi-particle decay algorithm in Muon1 version 4.43 and above |
Poster Presented at the 'SET for Britain' event at the House of Commons (.ppt, 4.70 MB) / View as image | November 2005 | Much expanded and updated form of the CERN50 poster section I did in September 2004 |
Talk Given at CERN International Scoping Study meeting, Comparing Pion Production in MARS15 and GEANT4 (.ppt, 680 KB) | September 2005 | Similar talk again, some initial slides on pulse structure added for context |
Computed Pion Yields from a Tantalum Rod Target: Comparing MARS15 and GEANT4 Across Proton Energies (.pdf, 305 KB) | September 2005 | NuFact'05 Conference Paper |
Talk Given at European Neutrino Group (ENG) meeting, Comparing Pion Production in MARS15 and GEANT4 (.ppt, 722 KB) | August 2005 | This is almost exactly the same as the NuFact'05 talk I gave; GEANT4 results thanks to Kenny Walaron |
Talk Presented at NuFact'05, Comparing Pion Production in MARS15 and GEANT4 (.ppt, 693 KB) | June 2005 | GEANT4 results thanks to Kenny Walaron |
Talk on Target Pion Production Studies at Muon Week, CERN (.ppt, 436 KB) | March 2005 | |
Simulations of Pion Production in a Tantalum Rod Target using MARS15 | January 2005 | |
Research Status Talk at Muon Week in DESY (.ppt, 397 KB) / Web version | November 2004 | |
Poster for the CERN50 UK technology transfer event (.ppt, 1.48 MB) / View as image | September 2004 | Collaborative poster: top section by Ken Long; middle section by myself; front-end test stand by David Findlay; target studies by Roger Bennett. |
Poster Presented at EPAC'04 (.ppt, 2.10 MB) / View as image | July 2004 | |
Article in PPARC's Frontiers magazine, about the Muon1 project | June 2004 | |
Paper presented at EPAC'04: "Quantitative Optimisation Studies of the Muon Front-End for a Neutrino Factory" | June 2004 | |
Research Status Talk at UK Neutrino Factory Meeting (.ppt, 2.08 MB) / Web version | May 2004 | |
General Research Talk at RAL/DL Joint Accelerator Workshop (.ppt, 1.41 MB) / Web version | April 2004 | |
Simulations of Neutrino Factory Muon Capture with Chicane (58 KB) | December 2003 | |
Research Status Talk at ISIS Accelerator Division Meeting (.ppt, 1.18 MB) / Web version | November 2003 | |
Simulations of Neutrino Factory Muon Capture with Chicane | June 2002 | |