•Muon1
modified to count lost particle energies
•For a
4MW p+ beam:
–35kW
deposited in S1 (r=10cm)
–Large
>1kW amounts deposited up to S5
•Added
“collimators” to the simulation
–Decreases
losses to 10’s of watts in all but S1 and S2
–S1
needs enlarging to accommodate an entire Larmor rotation
•Consistent
target-area layout is needed