Stephen Brooks 2005-07-15 12:29:44 | http://www.interactions.org/cms/?pid=1020855 Scoping study 2005-06 Conceptual design study 2006-09 Post-LHC funding window 2010-> Then, if approved, engineering design and build. Facility would be completed in the 2020s. |